Modify the Delivery Date 修改交货日期 Dialog A third bargaining chip is modifying the delivery date to allow more time for the manufacturer to produce the required units. 第三个可以用来议价的筹码是修改交货日期,这给制造商更充裕的时间来制造你所订的数量. Mel:And that's the bottom line.Not too bad ,even if I do say so myself. 这是最低价格了,我自己看都觉得很不错了. Bill:Well,to be honest,I was figuring on something about 10% lower. 老实说,我还希望能再打9折. Mel:That's about what I'd normally charge,but you added these time restrictions and I'm going to have to pay some overtime to get it in under the wire. 其实我平常就是那个价码,但因为你有时间限制,我得请工人加班,才能准时交货. Bill:So how much time do you need to lower the price? 时间要往后延多久,我才能有折扣? Mel:Usually there isn't any time requirement. 我通常都不压时间限制的. Bill:I know that,but I'm not going to do that.I want this finished quickly with no breaks in between,so the time limit stays. 我知道,但我不想这样.我希望这批货尽快完成,完全没有延误,所以时间限制不能变. Mel:I won't do that to you. 我不会害你开天窗的. Bill:Right,not with this penalty in the contract. 没错,因为这次迟交会有罚款. Mel:Okay.Give me fifteen working days from start to finish and I'll lower the price 10%. 好吧.开工后,给我15个工作日,我就再降个百分之十. Bill:How about ten days? 10天如何? Mel:I need 12 or no deal. 我要12天,否则免谈. Bill:Done! 成交. Vocabulary 重要词汇 bottom line总价底线 restriction 限制 under the wire顺利运作 penalty罚款 |
原文地址:http://www.tingroom.com/lesson/tpyy/65564.html |